Battery gives gerbera growers greater flexibility and lower energy costs
About Klondike
The energy system
Brielle
- 2.4 MW CHP unit
- 1.2 MW electric boiler
- 1.6 MW / 3.2 MWh battery, supplied by Zwart Techniek
- 5,000 m³ heat storage tank
- LED lighting
Vierpolders
- Geothermal energy
- 1.6 MW CHP unit
- 1.2 MW electric boiler
- 5,000 m³ heat storage tank
- LED lighting
- Solar panels
Two requirements: within the connection, and the right partner
“It quickly became clear that a battery could offer us greater flexibility and lower costs,” says Van de Westelaken. “But we had to stay within our existing 2.4 MW connection limit. And we wanted a partner who really understands our business operations, because they will be managing everything holistically.” Together with installer Enthoven Techniek, Globe Plant turned to Zwart Techniek for the battery and to Enova for the energy management system. Kay Geurts is the designated point of contact.
How does the system stay within that 2.4 MW limit? Zwart Techniek’s EMS continuously monitors the connection limit. Enova sends its signals to that system, which only executes them within the specified limits. This allows the battery to participate fully in the energy markets without overloading the connection.
Weekly meetings
“We take care of all aspects of energy management,” says Geurts. “We configure the battery, CHP unit and electric boiler to maximise returns on the energy markets, whilst ensuring the crops always receive what they need. Based on the cultivation plan, we assess the level of flexibility available. We then draw up a comprehensive control strategy: maximum yield, minimum costs and no compromises on crop production. We hold meetings almost weekly to discuss expected consumption patterns, available installations and the market. Flexible capacity for grid balancing and emergency power for TenneT are always on the agenda.”
Result: payback period of approximately four years
“We’ve been working together for about a year now,” says Van de Westelaken. “Since the battery came online, things have been running in a very structured way. Enova provides regular, detailed reports. These show that the integrated management and the exploitation of market opportunities have already yielded significant results. If this trend continues, the battery will have paid for itself in about four years.”
The benefits of flexibility
“Without a battery and an integrated control system, you’re a lot less flexible, and so you can’t optimise as much,” says Geurts. “High energy prices then become an immediate risk. With flexibility, you’re less vulnerable to price rises. With a battery, you can even benefit from this: the differences between the highest and lowest prices are becoming ever greater. In addition, we use the battery at times when electricity demand is high. This helps us avoid a high monthly peak, which makes an immediate difference to grid costs.”
Next step: congestion management
The next step for Globe Plant is congestion management: making capacity available to alleviate regional grid congestion. “This will particularly benefit industry in the Rotterdam port area. It’s great that the greenhouse horticulture sector can demonstrate its contribution in this way,” says Van de Westelaken.
“Flexibility, decisiveness and looking ahead, both in the short and long term. That’s what determines whether your business is future-proof,” concludes Van de Westelaken. “Enova is a good partner in this regard.”
Ready to explore intelligent energy management?
Get no-obligation advice on the possibilities for your business. Get in touch with our specialists.
Would you like to talk about energy management?
Answer a few short questions so our team can get in touch.